Star Refinery / İzmir

Personnel support was provided for the maintenance of control valves, shut-off valves, and mechanical valves during the planned refinery shutdown.

Yürek Polimer / Bursa

Instrument and control valve assembly services are provided in partnership with META Elektrik/Elektronik Ltd. Şti.

Havatek / Erbil Havalimanı (2024-2025)

The electrical and instrumentation detailed engineering services for the Iraq Erbil Airport JET A1 tank construction, truck loading/unloading metering and control systems project were completed.

Üstay /Tüpraş İzmir Rafinerisi (2025-2026)

Within the scope of the İzmir Refinery Propane–Propylene Storage and Sales System Facility Project, review of the engineering work from the instrumentation discipline perspective to ensure compliance with Tüpraş and international standards were completed. The process also includes the technical evaluation of quotations received for the procurement of instrumentation equipment and the management of vendor follow-up activities.

Rönesans Endüstri Tesisleri / Türkmenistan (2025-2026)

As part of the recommissioning project of the Kiyanly Polymer Plants in Turkmenistan, undertaken by the Rönesans–TOYO Consortium, physical and functional inspections as well as fault diagnostics were performed and reported for approximately 22,000 instrumentation and control signals in the field by a team consisting of 40 instrumentation personnel and 5 control operators (boardmen). Within the scope of the project, approximately 550 valves (including PSV, shut-off, and control valves) were dismantled and subjected to leakage testing. Valves that failed the tests were further disassembled for detailed troubleshooting and root cause analysis.

TÜPRAŞ BATMAN REFINERY (2026)

At the Tüpraş Batman Refinery, all field instrumentation and mechanical equipment associated with the H-508 boiler—which had experienced commissioning difficulties and was used as a standby unit—were tested. Faults were identified and rectified. The boiler was successfully commissioned and handed over to Operations, with the ESD logic and DCS monitored throughout the process.

Issues with the burner controller and PLC system of the H-510A boiler at the Tüpraş Batman Refinery were identified and resolved, and the boiler was commissioned.

ENKA / TÜPRAŞ İZMİR REFINERY (2026)

Pre-commissioning, commissioning, and start-up services are being provided to ENKA A.Ş. for the process, operations, rotating equipments, static equipments, piping, electrical, and instrumentation disciplines of the UOP-licensed PRU (Propylene Recovery Unit) unit, with a capacity of 500 Sm³/day, currently under construction by ENKA A.Ş. at the Tüpraş İzmir Refinery. The project is ongoing.

Yürek Polimer / Bursa

META Elektrik/Elektronik Ltd. Şti ile çözüm ortağı olarak enstrüman ve kontrol vana montaj hizmeti verilmektedir.